Analysis of the Limitations of the Earned Value Management Method and Evaluation of Modern Improvement Approaches in Project Management
Keywords:
earned value management, Project Control, Time and Cost ControlAbstract
The Earned Value Management (EVM) method is one of the most comprehensive tools for monitoring and controlling projects in terms of cost and schedule performance. Despite its effectiveness in providing performance indicators and forecasting project trends, limitations such as neglecting the critical path, reliance on accurate data, and weak applicability in agile or complex project structures have led researchers to seek methods for its improvement. This article aims to critically analyze the limitations of the Earned Value Management method and examine newly proposed approaches for its enhancement. In this regard, five improved models are reviewed, including the Advanced Earned Value Model, the Agile Earned Value Management approach, integration with Value Engineering, the Weighted Earned Value Method, and the Critical-Activity-Based Model. These approaches, by focusing on enhancing the accuracy of time and cost forecasting, incorporating scope changes, weighting activities, and analytically emphasizing the project’s critical path, can effectively reduce the limitations of the traditional method. Finally, a comparative analysis among these approaches is conducted, and recommendations are provided for selecting an appropriate solution based on project type and execution conditions. The findings of this study can significantly contribute to more accurate decision-making by project managers for integrated control of time, cost, and performance.
References
H. Kerzner, Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons, 2025.
A. Nizam and A. Elshannaway, "Review of earned value management (EVM) methodology, its limitations, and applicable extensions," Journal of Management & Engineering Integration, vol. 12, no. 1, pp. 59-70, 2019.
D. S. Christensen, "The costs and benefits of the earned value management process," Journal of Parametrics, vol. 18, no. 2, pp. 1-16, 1998.
R. Corovic, "Why EVM is not good for schedule performance analyses (and how it could be…)," The Measurable News, pp. 2006-2007, 2006.
S. Bovteev and M. Petrochenko, "Method “Earned Value Management” for timescale controlling in construction projects," Applied Mechanics and Materials, vol. 725, pp. 1025-1030, 2015.
L. Mayo-Alvarez, A. Alvarez-Risco, S. Del-Aguila-Arcentales, M. C. Sekar, and J. A. Yáñez, "A systematic review of earned value management methods for monitoring and control of project schedule performance: An AHP approach," Sustainability, vol. 14, no. 22, p. 15259, 2022.
V. Aramali, H. Sanboskani, G. E. Gibson Jr, M. El Asmar, and N. Cho, "Forward-looking state-of-the-art review on earned value management systems: The disconnect between academia and industry," Journal of Management in Engineering, vol. 38, no. 3, p. 03122001, 2022.
L. F. Cândido, L. F. M. Heineck, and J. d. P. Barros Neto, "Critical analysis on earned value management (EVM) technique in building construction," in annual conference of the international group for lean construction, 2014, vol. 22.
S. E. Smith, "Earned Value Management Schedule Performance Indicators in Units of Time: Evaluation of an Earned Schedule Theory," Air Force Institute of Technology, 2005.
Q.-b. Zheng and X. Bi, "Optimization on earned value method combined with critical path," in Proceedings of 2013 4th International Asia Conference on Industrial Engineering and Management Innovation (IEMI2013), 2013: Springer, pp. 707-715.
C. Stone, "Challenges and opportunities of completing successful projects using Earned Value Management," Open Journal of Business and Management, vol. 11, no. 2, pp. 464-493, 2023.
M. T. Zia, "The Role and Impact of Artificial Intelligence on Project Management," Abbdm, vol. 4, no. 02, 2024, doi: 10.62019/abbdm.v4i02.160.
Y. Zhang, "The Successful Factors for Digital Transformation in Project Management," Advances in Economics Management and Political Sciences, vol. 79, no. 1, pp. 297-303, 2024, doi: 10.54254/2754-1169/79/20241858.
A. Aliyev, "Marketing and Project Management 4.0: Next-Generation Digital Tools," Scientific Research, vol. 4, no. 12, pp. 87-90, 2024, doi: 10.36719/2789-6919/40/87-90.
J. Silva, A. Silva, A. Araújo, and A. Silva, "Agile Project Management in Government Software Development: Addressing Challenges in Education Public Policy," 2025.
R. St-Martin and D. Fannon, "Gestión del valor ganado del trabajo en curso," Recuperado de https://americalatina. pmi. org/latam/KnowledgeCenter/Articles/~/media/2B437B 5C09974800A9EE8654AE0323C0. ashx, 2010.
H. Souza, V. A. P. Salomon, and S. Carlos Eduardo Sanches da, "Statistical Predictors of Project Management Maturity," Stats, vol. 6, no. 3, pp. 868-888, 2023, doi: 10.3390/stats6030054.
J. I. Santos, "Explainable machine learning for project management control," Computers & Industrial Engineering, vol. 180, p. 109261, 2023, doi: 10.1016/j.cie.2023.109261.
S. Sidra and S. M. Wagan, "Investigation of the Factors That Influence Team Performance in Project Management: The Case of Habib Bank Limited," Management Dynamics in the Knowledge Economy, vol. 12, no. 4, pp. 371-390, 2024, doi: 10.2478/mdke-2024-0022.
Downloads
Published
Submitted
Revised
Accepted
Issue
Section
License
Copyright (c) 2025 Amir Mohammad Safari Zarch, Mohammad Mokaberian (Author)

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.