[1]
Moradi, M. et al. 2027. An Integrated Model for Simultaneous Time–Cost Optimization of Construction Projects through the Integration of System Dynamics, Earned Value Management, and the Simulated Annealing Algorithm. Management Strategies and Engineering Sciences. (Jul. 2027), 1–18.