(1)
Moradi, M. .; Mashayekhi Nezamabadi, E.; Khishtandar , S. . An Integrated Model for Simultaneous Time–Cost Optimization of Construction Projects through the Integration of System Dynamics, Earned Value Management, and the Simulated Annealing Algorithm. MSES 2027, 1-18.