[1]
M. . Moradi, E. Mashayekhi Nezamabadi, and S. . Khishtandar, “An Integrated Model for Simultaneous Time–Cost Optimization of Construction Projects through the Integration of System Dynamics, Earned Value Management, and the Simulated Annealing Algorithm”, MSES, pp. 1–18, Jul. 2027, Accessed: Sep. 18, 2026. [Online]. Available: https://msesj.com/index.php/mses/article/view/516